Peach Roofing returned to Lee & Betty Carroll’s Decatur home for a two-day comprehensive project—installing a new 40-square Charcoal HDZ Timberline Lifetime roof, repairing storm-damaged sections above the furnace, and restoring 18 LF of underground gutter drainage—earning another 5-star review for the team’s decade-plus of reliable, professional service.

Scope of Work

  • Full Roof Replacement: Tear off 40 squares existing architectural shingles & underlayment; install Charcoal HDZ Timberline Lifetime shingles over synthetic felt with GAF Pro-Start starter and Seal-A-Ridge cap; ice-and-water shield in low-slope zones, valleys, fireplace chase & dormers; replace single-over ridge vent, drip edge, pipe jacks, 5″ furnace vent/rain cap/storm collar, and up to 64 sq ft decking; magnetic nail sweep & dump-trailer disposal.
  • Roof Repair: Remove 4 squares shingles & felt above furnace; replace 1 sheet rotted decking; install ice-and-water shield, new architectural shingles (color-matched), two heavy-duty plumbing boots, and new metal vent stack; cleanup & magnetic sweep.
  • Gutter Repair: Install 18 LF 4″ PVC drain pipe, modify concrete curb, dig sod-saving trench; restore site & haul debris.

Primary Materials Supplied & Installed

  • Charcoal HDZ Timberline Lifetime architectural shingles – 40 squares
  • GAF Seal-A-Ridge ridge cap & GAF Pro-Start starter shingles
  • Synthetic roof underlayment
  • Ice-and-water shield membrane
  • 7/16″ OSB roof decking – 3 sheets (64 sq ft + 32 sq ft)
  • Aluminum drip edge – full perimeter
  • Single-over ridge vent – replaced
  • Pipe-jack flashing & heavy-duty plumbing boots – 2 units
  • 5″ furnace vent assembly (boot, collar, rain cap, storm collar)
  • 4″ PVC drain pipe – 18 LF
  • Dump trailer & disposal included